Operational Energy Savings Savings are based on direct loss of energy. | |
---|---|
Cost Savings, with additional heated areas/equipment, stairs or railings Estimation of cost of additional de-icing systems. | |
Capital savings Based on additional auxiliary power needed. The savings can be bigger in diesel-electric vessels, while the costs are not linear in such systems. | |
Direct work & Administrative reporting savings Based on annual labour costs of manual reporting, maintenance and operational work needed on non-automated de-icing. | 24 000 € |
Installation Savings Starkice system can be installed, in most cases, during normal harbour visits due to Starkice modular design and it is faster to install. | |
Total cost saving in 1 year | |
Total Cost Saving in 5 Years |